Garmin Corporate Campus Phase Garmin Corporate Campus Phase I is a new, two-story, 60,000 SF office building for the Garmin corporation in Chandler, Arizona. The new building is the first of two projects at Chandler Corporate Center and will house professional staff working in product research and [...]
Goodmans Interior Structures Goodmans Interior Structures is a sustainable working showroom of 19,000 SF showcasing a diverse selection of solution-based products. The building, originally built in 1977, underwent a major LEED for Commercial Interiors renovation during 2004. The new interior [...]
El Chorro Lodge Built in 1934 as a school for girls and later transformed into a restaurant and lodge, El Chorro Lodge has a long history as one of the Valley of the Sun’s favorite landmarks. The project team made it a top priority to keep El Chorro’s rich history and classic charm while [...]
Charles Schwab Branch at the Peak This project is an earnest effort by Charles Schwab to convey the image of a green company and is one of only a few branches that Charles Schwab has built from the ground up. From the onset of the project it was decided that some level of LEED certification would [...]
Kansas State University Jardine Apartments Reflecting a campus commitment to sustainability, the completion of this tenant improvement project caps off a major phase of the overall Jardine student housing project on the K-State campus. The original Jardine complex buildings are being replaced, by [...]
Bank of America Cash Vault The Bank of American Cash Vault in Tempe, Arizona is a 31,829 SF project unique both structurally and internally. The building is part of Bank of America’s initiative to contribute to sustainable business practices addressing global climate change over the next 10 [...]
BASF Administration Building The BASF Administration Building is within a chemical plant located in West Memphis, Arkansas on the Mississippi River, directly west of the City of Memphis, Tennessee. Green Ideas integrated several sustainable strategies into the design, development, and construction [...]
One Empire Pass Project Update One Empire Pass is a cutting-edge, luxury condominium project located in the mountains above Park City, Utah. Green Ideas worked with the owner and developer East/West Partners, alongside IBI Group and their engineering consultants, to validate envelope assemblies, [...]
General Motors IT Innovation Center This three-story, 169,903 SF office building will house workers for General Motor’s new Arizona IT Innovation Center. The project was successfully fast-tracked in its design and construction which utilized tilt-up concrete panels. It was developer Mark [...]
MLK Apartments The new MLK Apartment building at Depot Plaza, in Tucson, Arizona provides 68 housing units for the elderly and disabled. The six-story building, completed in late 2010, includes amenities such as a general store, tenant counselor, medical aide, computer room, library and community [...]